JOB VOLUME
430.000 m³
ÇANAKKALE
ÇAN2 THERMAL POWER PLANT
Industrial type scaffolding rental, installation and dismantling services have been provided in line with the needs of planned and unplanned maintenance stops of Çan2 Thermal Power Plant, which is among the top 20 thermal power plants of Turkey operating in Çan district of Çanakkale Province, since 2017. . Boiler, absorber etc. in the facility. Scaffolding was installed and dismantled in order to carry out the necessary maintenance and repairs in the internal and external environments of various equipment.
JOB STATUS
CONTINUED1SECTOR
TERMİK SANTRALİ